Construction Equipment HVAC Systems

Off-road vehicles like construction equipment require high levels of reliability and durability. Equipment downtime is a very costly event for machines that oftentimes must run 16 hours per day, or more, seven days per week.

Allied Motion's design team developed specific product lines of DC brush and brushless motors that meet the extreme operating requirements of fan and blower systems in construction equipment HVAC systems, and that provide extended life, improved noise suppression, excellent shock and vibration resistance, and improved water sealing characteristics, as well.

Please login to view this document

Need an account? Sign Up

Forgot your password?

* If you do not already have a registered account, additional information may be required.

Thanks for logging in.

Click here to download your document

Begin Download